On March 11 2011, Fukushima Daiichi nuclear power plant site was attacked by a huge tsunami caused by Tohoku Pacific Ocean earthquake. Nuclear fuels of unit 1, 2, and 3 of Fukushima Daiichi nuclear power plant was melted down by the disaster. After the accident, Japan’s government has announced “Mid-and-Long-Term Roadmap towards the decommissioning of TEPCO’s Fukushima Daiichi Nuclear Power Station Units 1-4”. The topics of roadmap is made of measures to deal with contaminated water, removal of fuel rod assemblies from spent fuel pools, retrieval of fuel debris, measures to deal with waste materials, and other operations. To support the activity of the roadmap, various facilities about decommissioning have been established and operated on inside or outside of Fukushima Daiichi nuclear power plant site. Representatively, Collaborative Laboratories for Advanced Decommissioning Science which conducts R&D decommissioning, Naraha Remote Technology Development Center which develops remotes robots and VR (Virtual reality), Okuma Analysis and Research Center which performs radiochemical analyses for radioactive waste, and Fukushima Environmental Safety Center which conducts environmental dynamics and radiation monitoring.
Japan’s government has announced plan to release the contaminated water stored from the tanks of the Fukushima Daiichi nuclear power plant site into the sea in June. The contaminated water is treated by SARRY (Cesium removal facility) and ALPS (advanced liquid processing system) to remove 62 radionuclide containing Cesium, Strontium, Iodine, and so on using filtration, precipitation (or coprecipitation) and adsorption for other nuclides (except for H-3 and C-14). The total amount of the contaminated water stored at tanks is 1,328,508 m3 (as of March 23, 2023). Currently, three ALPS systems which are existing ALPS, improved ALPS, high performance ALPS have been operated to meet the regulatory standard for release to the sea. According to the release plan, they have announced that 30 nuclides and H-3 concentration of the contaminated water will be measured and assessed before/after the discharge of the contaminated water into the sea. Before the release, the contaminated water is re-treated by reverse osmosis membrane facility and additional ALPS. And then, the water will be diluted with seawater more than 100 times. The diluted water will then move through an undersea tunnel and be released about 1 kilometer off the coast.
Recently, Japan’s government has announced Tokyo Electric Power Company’s plan to discharge contaminated water stored from the tanks of the Fukushima Daiichi nuclear power plant site into the sea. The contaminated water is treated by advanced liquid processing system (ALPS) to remove 62 radionuclide containing cesium, strontium, iodine and etc. using co-precipitation (or precipitation) and adsorption for other nuclides (except for tritium and carbon-14). The total amount of the contaminated water generated by ALPS facility is 1,311,736 m3 (as of August 18, 2022). The amount of contaminated water is estimated same as Tokyo dome volume. Under the sea discharge plan, the contaminated water will be diluted in seawater more than 100 times, and tritium concentration lowered 1/7 of the drinking water standard set by the World Health Organization (10,000 Bq/liters). The diluted water will then move through an undersea tunnel and be discharged about 1 kilometer off the coast.