검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 2

        1.
        2016.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This paper considers the allocation and engagement scheduling problem of interceptor missiles, and the problem was formulated by using MIP (mixed integer programming) in the previous research. The objective of the model is the maximization of total intercept altitude instead of the more conventional objective such as the minimization of surviving target value. The concept of the time window was used to model the engagement situation and a continuous time is assumed for flying times of the both missiles. The MIP formulation of the problem is very complex due to the complexity of the real problem itself. Hence, the finding of an efficient optimal solution procedure seems to be difficult. In this paper, an efficient genetic algorithm is developed by improving a general genetic algorithm. The improvement is achieved by carefully analyzing the structure of the formulation. Specifically, the new algorithm includes an enhanced repair process and a crossover operation which utilizes the idea of the PSO (particle swarm optimization). Then, the algorithm is throughly tested on 50 randomly generated engagement scenarios, and its performance is compared with that of a commercial package and a more general genetic algorithm, respectively. The results indicate that the new algorithm consistently performs better than a general genetic algorithm. Also, the new algorithm generates much better results than those by the commercial package on several test cases when the execution time of the commercial package is limited to 8,000 seconds, which is about two hours and 13 minutes. Moreover, it obtains a solution within 0.13 ~33.34 seconds depending on the size of scenarios.
        4,800원
        2.
        2014.02 구독 인증기관 무료, 개인회원 유료
        The purpose of this study is to provide the data for sewage policy by selection of demending section and priority for interceptor renovation in Daejeon Metropolitian City. The order of priority for interceptor renovation in this city is Daejean-cheon, Youdeng-cheon, Gab-cheon, Youseong-cheon and Jinjam-cheon. Length of demanding section for renovation is 5.6 km for Daejean-cheon, 11.9 km for Youdeng-cheon, 13.8 km for Gab-cheon, 10.4 km for Youseong-cheon, and 3.9 km for Jinjam-cheon, respectively. The total length for interceptor renovation is 45.6 km. Assuming 30% as partial repair and 70% total repair on trenchless replacement, total renovation cost is calculated 98.2 billion won, 3.5 billion won for Daejeon-cheon, 1.2 billion won for Jinjam-cheon, 49.7 billion won for Gab-cheon, 4.3 billion won for Youseong-cheon, and 39.5 billion won for Youdeng-cheon.
        4,000원