The paper presents the measurement split split-plot models for saving the time and cost. The split split-plot designs developed are efficiently used to estimating the gauge R&R(Reproducibility & Repeatability) when the completely randomized design of all factors(such as high pressure and temperature) is expensive and time consuming. The models studied include three split split-plots considering the type of experimental units.