검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 1

        1.
        2023.05 구독 인증기관·개인회원 무료
        The concrete structure of a nuclear power plant is a major safety structure that performs shielding functions to block radioactive materials and radiation, heat removal, and isolation functions. Therefore, concrete structures of nuclear power plants must prove structural safety from immediately after construction to dismantling, and a representative method for this is to investigate compressive strength. The compressive strength and specimen standards of concrete structures are specified in ASTM C 42/C 42M, and samples must be obtained through core drilling in order to collect samples according to this standard. However, commercial equipment requires anchor installation work causes radiation dust generation. Even commercial products have developed equipment that does not require anchor installation work, but it can only be applied to flat walls and cannot be applied to curved walls such as bioshields. To solve this problem, a method of fixing to the scaffolding pipe was designed. The equipment developed based on this method fundamentally blocks the generation of radioactive dust. The vertical position can be adjusted using guide shafts and jack screws, and the horizontal position can be adjusted using scaffolding clamps. In addition, the distance between the installation location and the wall can be adjusted by adjusting the scaffolding clamp location of the device. Lastly, it can be rotated to the left and right, so that even on a curved wall, the sampling position can be performed perpendicular to the wall. Core drills that take specimens for measuring compressive strength use the wet type. Core drilling by wet type in radioactively contaminated concrete leads to the disposal of sludge as radioactive waste. Water supplied during core drilling is scattered in all directions by the rotation of the core drill bit, which causes radiation exposure to workers, so measures must be taken to ensure that the water does not splash and gather in one place. Nileplant Co., Ltd. has developed a sludge collection device that can be used with a core drilling device. It can be inserted into a 4-inch core drill bit to meet the specimen regulations of ASTM C 42/C 42M, and nylon resin was used as a material to withstand friction with water, and the wall of the drainage part was thickened to increase durability. Based on these results, it is expected to be able to work more quickly and safely when collecting core drilling samples of radioactively contaminated concrete or radiation and concrete.