The cable staying roof structure of Jeju worldcup stadium should be erected with correct prestressed force that is required by the structural engineer who designs this structure. This study evaluated and adapted the erection process of cable, the erection force and the measurement of cable force for Jeju worldcup stadium. The process of erection is required not only to calculate erection force but also to check structural stability, following process, construction period and using cranes. Considering the site conditions and technical problems, this study can attain successfully the erection of cable staying roof structure of Jeju worldcup stadium with allowable errors.