검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 1

        1.
        2012.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES : This paper presents how to determine priorities of RWIS installation on national highways within the limited budget. METHODS : Analytical hierarchy process was employed to develop the entire methodology. In addition to this, various data such as vulnerable roadway section for snow removal, RWIS, AWS, AADT, and traffic accident were properly collected and analyzed for the future analysis. Then, GIS analysis was performed to find out the final candidate vulnerable roadway section for snow removal. In the end, expert survey was conducted to estimate weights for evaluation criteria. RESULTS : Results showed that metropolitan area has the most high priority, and Gangwon area, ChungCheung, and Honam in order. CONCLUSIONS : The main contribution of this paper is to suggest a logical methodology to prioritize RWIS installation within the limited budget, and thus snow removal operation during the winter season can improve in terms of getting more valuable information.
        4,000원