논문 상세보기

시공중 TBM 터널의 정보화 요소 분석

Analysis of the Information Factors during TBM Tunnel Construction

  • 언어KOR
  • URLhttps://db.koreascholar.com/Article/Detail/292091
서비스가 종료되어 열람이 제한될 수 있습니다.
한국구조물진단유지관리공학회 (The Korea Institute For Structural Maintenance and Inspection)
초록

Not long ago, most escavation methods for tunnel or underground structure are selected by NATM method. But these days such as Shield TBM or Semi-shield TBM are applicated for structure length and ground condition. On the other hand almost TBM technology is depend on foreign country, so this technology is much a work in process. In this study, information factors during TBM tunnel construction was suggested by analysis in-situ data

저자
  • 김태호(㈜넥스지오 대리) | Kim, Tae Ho Corresponding Author
  • 박성욱(㈜넥스지오 부장) | Park, Sung Wook
  • 이인모(고려대학교 건축사회환경공학부 교수) | Lee, In Mo