검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 5

        1.
        2013.03 구독 인증기관 무료, 개인회원 유료
        In rapidly changing circumstances, the construction industry shows tendency to be more complicated and expanded and these changes are becoming the main factors aggravating uncertainty in straightening construction costs in the industry. The most important process in preliminary phase is calculation of appropriate construction sum and accurate estimation is required to accomplish it. Currently, local constructors draw up estimates by using the ‘per square meter’ calculation method or by applying of previous cases as they are. These methods become suppressive cause for making clear decisions by occurring errors in quantity survey in a way of data emission, replication and so on. Therefore, in this study, approximate estimation model of finishing construction shall be proposed to assist people to make prompt decisions in initial design stage. To develop this research, the existing quoting practices shall be presented and categorized by usage of space. To achieve this, information on performance, furnishings and unit price according to space definition has been collected in advance, which again enable ontology knowledge classification scheming database of space unit to be utilized and presented as knowledge information.
        4,000원
        2.
        2012.03 구독 인증기관 무료, 개인회원 유료
        Recent projects for transferring Public Office buildings and estimation of appropriate construction expense are highly important for both government and construction firms. Moreover, estimation and management of construction expense can be regarded as extremely important duties for effective execution of a national budget as nation’s finance is invested in the Public office building projects progressed by the government. To progress one project for Public office building, not only the organization demanding the project but also an investment screening organization, a budget-managing organization, a feasibility assessment institution and many other related organizations participate in the project and a lot of decisions arisen from the project operation are made on the basis of construction expenses calculated for relevant stages. And estimation of rational construction expense is also critical for designers in order to create design within the fixed budget simultaneously with securing the quality and efficiency of structures to the maximum. Therefore this research suggested an improvement process to analyze problems in current construction expense management process and to administer the construction expenses effectively.
        4,000원
        3.
        2010.03 구독 인증기관 무료, 개인회원 유료
        Recently expanding market for largely scale construction projects, cost management of construction project have been increasingly recognized as an important factor responsible for the project success. But public organizations have been continuously operating the same methods as before in cost estimating, so it raise an issue of reliability for estimated cost. Therefore, this study present a highly reliable model that makes preliminary estimates based quantity data in early design stage. it enables engineers to efficiently manage total cost of project as well as partial cost estimating. This study develop a model of database that is created with historical data conducted by government offices. The model proposed can estirnate a cost for RC Structure in schematic design stage, and it is applied to CBR+GA logics to explore best similar cases. In case of estimating methods used to previous research, it is based on actual cost data. Due to the cost estimating compensated by inflation rate vary in market economic conditions, it will follow as an inevitable consequence of reliability problem. It needs to find better way to ensure accuracy through quantity database. Also, This study has been conducted in attempts to verify the reliability of preliminary estirnation. It is checked for the feasibility of presented model with P-National Tax Service Project aside from the database.
        4,000원
        4.
        2008.03 구독 인증기관 무료, 개인회원 유료
        The renovation project of an apartment building can be classified into four processes: ordering the project stage, planning stage, examination and judgment stage, design stage and construction stage. However, in the domestic renovation business, the project performance process has yet to be madε systematic by stage. Of the stages involved in renovation, the design stage is the one that involves very complex roles and business processes of those involved in the project, including the project manager, architect,resident and engineer. In particular, in the design stage, the insufficiency in the ability to utilize the input information by project participants and improper decision making cause various problems in the subsequent construction and ultimately make it difficult to accomplish a renovation project that fully satisfies the residents. Therefore, the design of renovation is a very important stage to ensure a comprehensive understanding of the project performance process as well as the recognition of the design management technology. For this purpose, we aim to analyze the information utilization process with focus on the input information at each stage of the design process. The information utilization process of this study is analyzed through the processes of input information, technical tools and output to establish a decision-making method for each design stage. The aim was to implement the project performance process for the general design management.
        4,000원
        5.
        2011.06 KCI 등재 서비스 종료(열람 제한)
        정부의 금융중심지 조성과 발전에 관한 법률에 따라 부산문현혁신지구에 새롭게 조성될 금융중심지는 기존 금융중심지와 차별화되어 해양특성을 반영한 금융집적지로서 비즈니스 중심지와 연계될 때 국제적 경쟁력을 확보할 수 있다. 본 연구는 금융중심지 개념, 유형 성립여건, 경쟁력 및 해외 사례고찰의 시사점을 통해 개발여건과 관련계획을 분석하여 부산국제금융센터의 국제적 경쟁력은 시민공원 및 북항재개발지구가 연계된 해양특성화에 있음을 제시하고, 관련된 육성 프로그램의 보완방향, 물리적 개발방향, 전략 및 지침을 포함한 개발방안을 제시한다.