검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 4

        1.
        2023.05 구독 인증기관·개인회원 무료
        Licensing for the application of the Polymer Concrete High Integrity Container (PC-HIC) to nuclear power plants has been completed or is in progress. Approval for the expanded application to all domestic nuclear power plants has been completed to utilize the 860 L PC-HICs for the 2nd stage surface repository, and the regulatory body is reviewing the license application to use the 510 L PCHICs for the 1st stage underground repository in the representative nuclear power plants. The 860 L PC-HICs, which have been licensed for all domestic nuclear power plants, will be used for safe storage management and disposal of low-dose dried concentrate waste and spent resin, and a total of 100 units is expected to be supplied to representative nuclear power plants that have been licensed first. The 510 L PC-HICs are planned to be used for underground disposal of high-dose spent resin and dried concentrate waste. Prior to the application of PC-HICs to nuclear power plants and disposal to the repository, it is necessary to establish realistic and reasonable requirements through close consultations between waste generator and disposal operators to ensure the suitability for disposal of PC-HIC packages and to carry out disposal delivery and acceptance work. Since the Polymer Concrete High Integrity Container (PC-HIC) has long-term integrity of more than 300 years and the barrier does not temporarily collapse, spent resin and dried concentrate waste, which are radioactive wastes to be solidified, can be disposed of much more safely in PC-HIC packages than solidified types. Acceptance criteria for the PC-HIC packages should be prepared fully reflecting the advantages of PC-HIC, and quality assurance methods for physical/chemical/radiological characterization results based on the Waste Certification Program (WCP) should be supported. In addition, infrastructure should be secured for safe transportation, handling, and storage of the PC-HIC packages. In this paper, we have tried to find a reasonable acceptance criteria, quality assurance method, and infrastructure level according to the dose and disposal conditions of PC-HIC packages.
        2.
        2023.05 구독 인증기관·개인회원 무료
        Domestic nuclear power plants developed the scaling factors for the radioactive waste generated from 2004 to 2008 for the first time. Afterwards, the effectiveness of continuous application of the scaling factors have been evaluated for newly generated radioactive waste over the past two years. It was confirmed that most of the initially developed scale factors were effective within a factor of 10 principle, which is an acceptable range. The scaling factors were updated using the analysis data base from 2004 to 2016. A scaling factor refers to the calculated abundance ratio between Key (Easy-to- Measure) and DTM (Difficult-to-Measure) nuclide at the time of generation of radioactive waste based on the source term in the reactor of an operating nuclear power plant. The effectiveness of continuous application of scaling factors can be evaluated at regular intervals regardless of operation status or when there are events that change scaling factors during nuclear power plant operation, such as zinc injection, large-scale facility replacement, and long-term shutdown etc. Even in the case of a permanently shut down nuclear power plant in which fuel is withdrawn from the reactor and generation of new nuclides by nuclear fission and radiation has stopped, periodic verification is conducted to confirm whether the scaling factor developed before permanent shutdown can be effectively applied to the radioactive waste generated after permanent shutdown. However, depending on the nuclear power plant decommissioning strategy or conditions, the period of permanent shutdown prior to decommissioning can be very long, so preparations are needed to ensure the appropriateness of scaling factor operation. In the case of domestic nuclear power plants, Kori Unit 1, a light water reactor, was permanently shut down in June 2017, and as a heavy water reactor nuclear power plant, the permanent shutdown of Wolseong Unit 1 was finally decided in December 2019 after twists and turns including large-scale facility replacement and long-term shutdown. In this paper, we have predicted when the scaling factors will change significantly due to radioactive decay and the difference in halflife between the Key and DTM nuclides over time after permanent shutdown. We also have tried to find appropriate countermeasures for the operation of scaling factors during permanent shutdown period, such as updating scaling factors or applying correction factors.