논문 상세보기

금형 높이가 다양한 프레스 공정의 금형 교체시간 단축 사례 KCI 등재

A Case Study for Reducing Exchange Time of Die in Punch Press Process with Various Die Height

  • 언어KOR
  • URLhttps://db.koreascholar.com/Article/Detail/22787
구독 기관 인증 시 무료 이용이 가능합니다. 4,000원
한국산업경영시스템학회지 (Journal of Society of Korea Industrial and Systems Engineering)
한국산업경영시스템학회 (Society of Korea Industrial and Systems Engineering)
초록

The reduction of setup time is very important in a lot production system. A punch press is a typical system of lot production. This paper describes a case study to reduce setup time of a punch press manufacturing system. Especially, this case study reduce

저자
  • 정병호 | Byung-Ho Jeong
  • 라순영 | Soon-Young La
  • 박보은 | Bo-Eun Park
  • 장연상 | Yan-Shuang Zhang