A Case Study for Reducing Exchange Time of Die in Punch Press Process with Various Die Height
The reduction of setup time is very important in a lot production system. A punch press is a typical system of lot production. This paper describes a case study to reduce setup time of a punch press manufacturing system. Especially, this case study reduce