The progress that becomes a basis for measuring the outcome of project is a core of project control. Follow-up corrective actions are determined depending on the degree of their differences. The methods of measuring the project progress have been developed though a variety of research and many were verified through the cases. Among such methods, this study selected Start/Finish method and Fixed Formula method. In order to check the limitations of the progress utilized in the two methods, the study compared their progresses to the progress of Percentage Complete method and analyzed the differences shown in their actual applications. Through this, it suggested the forms and scale of the projects appropriate to the application of Fixed Formula method. As for the research progress method, the study first generated a number of virtual project schedules for the establishment of an analysis model. These project schedules were varied in a way that they had different project periods and the number of different activities. The study also generated numerous project schedules for difference test. After establishing a virtual schedule plan by the scale of projects, it measured their progresses by period, analyzed the differences and repeated this procedure to obtain the results.