The existent system of management for Measurement of Safety Cost are not effective because of the data loss and time loss and occurrence of errors through manual calculation. Therefore, the development of the software for measurement of safety cost can solve the problem through the systematic calculation for safety cost and converting the related data to database, and also can build the strategy of the investment of Safety cost through analysing and comparing with the past data in the database. As a part of development of the software of Measurement of Safety Cost which is appropriate for the domestic environment, this study is developing a software based on Noguji method, which is one of the methods of Measurement of Safety Cost, and to appraise the efficiency of the management of Measurement of Safety Cost we will implement and improve the software in the case of the domestic enterprises.