논문 상세보기

고속도로 진출입램프 접속부상의 지체예측모형 구축에 관한 연구

Construction of Delay Predictive Models on Freeway Ramp Junctions

  • 언어KOR
  • URLhttps://db.koreascholar.com/Article/Detail/261863
서비스가 종료되어 열람이 제한될 수 있습니다.
Journal of Korean Port Research (한국항만학회지)
한국항해항만학회 (Korean Institute of Navigation and Port Research)
초록

Today freeway is experiencing a severe congestion with incoming or outgoing traffic through freeway ramps during the peak periods. Thus, the purpose of this study is to identify the traffic characteristics, analyze the relationships between the traffic characteristics and finally construct the delay predictive models on the rap junctions of freeway with 70mph speed limit. From the traffic analyses, and model construction and verification for delay prediction on the ramp junctions of freeway, the following results were obtained : ⅰ) Traffic flow showed a big difference depending on the time periods. Especially, more traffic flows were concentrated on the freeway junctions in the morning peak period. ⅱ) The occupancy also showed a big difference depending on the time periods, and the downstream occupancy(Od) was especially shown to have a higher explanatory power for the delay predictive model construction on the ramp junctions of freeway. ⅲ) The delay-occupancy curve showed a remarkable shift based on the occupancies observed : Od/〈9% and Od/≥9%. Especially, volume and occupancy were shown to be highly explanatory for delay prediction on the ramp junctions of freeway under Od/≥9%, but lowly for delay prediction on the ramp junctions of freeway under Od/〈9%. Rather, the driver characteristics or transportation conditions around the freeway were thought to be a little higher explanatory for the delay prediction under Od/〈9%. ⅳ) Integrated delay predictive models showed a higher explanatory power in the morning peak period, but a lower explanatory power in the non-peak periods.

저자
  • 김정훈
  • 김태곤