This study aims at improving the channel of Pudo-sudo in Chinhae-Man according to the development project of the port of Masan, by investigating the design criteria of harbour facilities for the maximum sized ship. The new deep-water route was proposed and according to it the present separation scheme was adjusted appropriately. The width of the deep-water route is suggested to be 350m and would be wide enough for the 30,000 DWT container ship to go through However, the proposed channel will be tested and validated by the shiphandling simulator.