Recently, the interest in streams are gradually increasing and also many studies about them are in progress. Many streams located in downtowns were constructed or restored through research. Downtown streams must be designed through PE(Postoccupancy Evaluation) to satisfy user's needs to maximize the usage of facilities along the streams. This study was carried out to research about PE of Sincheon stream located in Daegu City, focusing on the search of the problems and improvement plans through the analysis about behavior of users who used the stream. These evaluation and analysis have their meaning to become a base information material for the future plan of downtown stream formations or the similar plans.