To conduct a nuclear fuel irradiation test, the inside of the nuclear fuel rod must be assembled along with the test fuel, several different parts, and sensors, and then filled with high-pressure and high-purityhelium gas. Therefore, it is necessary to develop helium gas filling techniques that can achieve exact TIG (Tungsten Inert Gas) spot welding at a pin-hole of the nuclear fuel rod to fill helium gas into the nuclear fuel test rod. However, previous apparatuses do not have repeatability for TIG spot welding as they lack an electrode position control jig to exactly fix a TIG electrode in a high-pressure chamber, and they consume a large amount of helium gas. Therefore, a TIG spot welding apparatus was developed to easily and accurately conduct TIG spot welding and significantly reduce the gas consumption. In addition, the optimum welding conditions of this welding apparatus were established through various weld tests.