한국구조물진단유지관리공학회(The Korea Institute For Structural Maintenance and Inspection)
초록
It was investigated that two arch tunnel was frozen in the winter. In recent years, winter is getting longer than the past. It need for measures to prevent an icicle occurrence in two arch tunnel due to abnormal climate changes.