Research on chloride penetration rate depending on the pore-structure in concrete
In the attempt to predict life time in a concrete, some modified pore structure in concrete was taken accounted to a diffusion modelling. As a result, total length coming from MIP and LTM methods was somewhat inconsistent with corresponding value from profiling. The reason was assumed that overestimated surface chloride content and penetration length with unaccurate determination of continuous pores.