NSSS 주기기 설치 최적공정개발 연구

Study on Optimal Process Development for NSSS's Installation

  • 언어KOR
  • URLhttps://db.koreascholar.com/Article/Detail/294143
서비스가 종료되어 열람이 제한될 수 있습니다.
한국구조물진단유지관리공학회 (The Korea Institute For Structural Maintenance and Inspection)
초록

Construction period is one of the most important factors which influence on cost and quality in nuclear power plant construction. As part of continued efforts for the competent reactor type, an improved method for NSSS(Nuclear Steam Supply System)'s installation in the reactor containment building is developed to minimize the construction period. This study referred to knowledge and experiences from nuclear power plant constructions over 30 years. The proposed method can be applied to the APR+ in the near future.

저자
  • 남덕우(한국수력원자력 중앙연구원 APR+개발팀 일반연구원) | Nam, Deok Woo
  • 강용철(한국수력원자력 중앙연구원 APR+ 총괄 PM) | Kang, Yong Cheol
  • 오철환(한국수력원자력 중앙연구원 APR+개발팀 과장) | Oh, Cheol Hwan
  • 이준희(한국전력기술(주) 신기술 BG 차장) | Lee, Jun Hee