The aim of this study is to evaluate performance of snow-resistant for the existing building. For this purpose, it was to propose a way to evaluate whether facilities reach goal performance as performance level separated by immediate occupancy level and collapse prevention level. Preliminary evaluation was developed to conduct by using assessment index of five items of vulnerability and two items of impact for selecting the reinforcement priority of target facilities.