In this study, hydration heat analysis of ternary blended concrete using mock-up structure was conducted in order to evaluate the temperature rise and crack index. The results of the analysis of hydration heat, it was found that it was convenient to obtain the minimum crack index and temperature rise of 3:5:2 mixing.