Yeongdo Bridge, the only bascule bridge in Korea, was reconstructed in 2013. The bridge has been in operation for a year till today, and lift-up once a day. This study includes the measurement and analysis of the bridge’s behaviour during its lift-up. The result is expected to be applied as the initial data of maintenance hereafter.