논문 상세보기

광역상수도 1, 2단계 취수펌프장 통합 운영시 수격현상

Waterhammer for the intergrated operating of the regional waterworks 1st stage and 2nd stage intake pumping station

  • 언어KOR
  • URLhttps://db.koreascholar.com/Article/Detail/308826
서비스가 종료되어 열람이 제한될 수 있습니다.
한국구조물진단유지관리공학회 (The Korea Institute For Structural Maintenance and Inspection)
초록

Recently, because people are taking a great interest in the water supply system and the related facilities are getting larger, the surge suppression is very important problem. The waterhammer occurs when the pumps are started or stoped for operation or tripped due to the power failure. As the waterhammer problems as a result of the pump power failure were very serious, these situations were carefully investigated. Accordingly, we carried out both numerical simulations to confirm the safety fot the intergrated operating of 1st stage and 2nd stage Juam intake pumping station in which had the in-line pumps. In this paper, it was reviewed that the water supply system has the reliability on the pressure surge, in case the air chambers were installed at both the inlet and the oulet of the in-line pumping station. we are sure that Juam intake pumping station in which have the air chambers is safe for the waterhammer.

저자
  • 신창건(한국시설안전공단 시설안전본부, 부장) | Shin Chang Gun
  • 안철홍(한국시설안전공단 시설안전본부, 부장) | Ahn, Cheoul Hong
  • 오영석(한국시설안전공단 시설안전본부, 실장) | Oh, Young Seok
  • 정지운(한국시설안전공단 시설안전본부, 선임) | Jung, Ji Un