This study is to determine the predictability of the ground cavitation by GPR equipment. Water and sewage pipeline buried in sand and soil tanks and to prepare a specimen for exploration of water and air cavities. The sand for a dielectric constant 8, the soil using 6.5 is preferred to extract data for the asphalt pavement condition. After the GPR detections, the cavity in sand tank rather than soil tank is to obtain more precise data.