PURPOSES : This study aimed to evaluate the long-term performance of bonded concrete overlay in Korean Highway, and factors influencing the performances. METHODS: The evaluation for long-term performance of bonded concrete overlay is investigated based on the following study : i) The pavement distress of number of bonded concrete overlay sections in Korean highway are collected through field measurement, and PCI for each section is calculated. ii) Performance of LTPP data of bonded concrete overlay sections in U.S.A is analysed. And it is compared with bonded concrete overlay of Korean highway. iii) An analysis of the factors influencing to long-term performance of bonded concrete overlay is investigated. RESULTS: Performance analysis was confirmed that the overlay thickness was affecting significantly on the Bonded Concrete Overlay life. The comparison of LTPP data(U.S.A) and field measurement data(Korean) was showed. CONCLUSIONS : It was showed that the performance of Korean bonded concrete overlay is relatively lower than that of the bonded concrete overlay in U.S.A. The cause of lower performance can be explained by the lack of overlay thickness.