In this study, repair and reinforcement priority determining method for each component of existing dams is suggested. Condition assessment results from in-depth inspection followed by “specific guide for in-depth inspection on dams” are used. Condition assessment is subdivided into several steps and evaluation indices are determined by considering weights such as influence coefficients and adjustment factors for each component through all of the steps. These weights are counted backward to determine the priority for each component and facility. An algorithm is designed to analyze this procedure and 4 target dams are adopted to verify the method. This method can be used for establishing an efficient maintenance strategy related to the repair and reinforcement priority determination.