Two-dimensional inverse study of double-track subway tunnel by measurement results
Tunnel were the inverse analysis based on the crown displacement calculated based on the generation of the result 63.80mm crown displacement measurement result. Inverse result was mainly to review the most significant impact on the interpretation weathed rock modulus of elasticity was smaller than the measurement when evaluating design values.*