논문 상세보기

단일 공급자 다수 구매자 공급체인에서 공급자주기 KCI 등재

The Cycle Time of the Vendor in a Single-Vendor Multi-Buyers Supply Chain

  • 언어KOR
  • URLhttps://db.koreascholar.com/Article/Detail/319521
구독 기관 인증 시 무료 이용이 가능합니다. 4,000원
한국산업경영시스템학회지 (Journal of Society of Korea Industrial and Systems Engineering)
한국산업경영시스템학회 (Society of Korea Industrial and Systems Engineering)
초록

This paper is to analyze the cycle time of the vendor in a single-vendor multi-buyers supply chain. The vendor is the manufacturer and the buyers are the retailers. The cycle time of the vendor is the elapse time from the beginning time of the production to the beginning time of the next production. The cycle time of the vendor that minimizes the total cost in a supply chain is analyzed. The cost factors are the production setup cost and the inventory holding cost of the vendor, the ordering cost and the inventory holding cost of the retailers. The cycle times of the vendor obtained with the costs of the vendor is compared with those obtained with the costs of the vendor and the retailers. Various numerical examples are tested if the cycle times of the vendor for both methods are the same.

목차
1. 서 언
 2. 단일 공급자와 다수 구매자 공급체인의 공급자주기
  2.1 공급자주기 방법 1
  2.2 공급자주기 방법 2
  2.3 공급자주기의 비교
 3. 수치적 예제
 4. 결 론
 References
저자
  • 장석화(인천대학교 산업경영공학과) | Suk Hwa Chang Corresponding Author