논문 상세보기

아웃소싱 전략을 활용하는 두 단계 흐름생산라인의 일정계획 KCI 등재

A Two-Machine Flowshop Scheduling with Outsourcing Strategy Allowed

  • 언어KOR
  • URLhttps://db.koreascholar.com/Article/Detail/319523
구독 기관 인증 시 무료 이용이 가능합니다. 4,000원
한국산업경영시스템학회지 (Journal of Society of Korea Industrial and Systems Engineering)
한국산업경영시스템학회 (Society of Korea Industrial and Systems Engineering)
초록

This paper considers a scheduling problem in a two-machine flowshop with outsourcing strategy incorporated. The jobs can be either processed in the first machine or outsourced to outside subcontractors. This paper wants to determine which jobs to be processed in-house and which jobs to be outsourced. If any job is decided to be outsourced, then an additional outsourcing cost is charged The objective of this paper is to minimize the sum of scheduling cost and outsourcing cost under a budget constraint. At first this paper characterizes some solution properties, and then it derives solution procedure including DP (Dynamic Programming) and B&B (Branch-and-Bound) algorithms and a greedy-type heuristic. Finally the performance of the algorithms are evaluated with some numerical tests.

목차
1. 서 론
 2. 문제정의와 분석
 3. FSO 문제 해법
  3.1 동적계획법
  3.2 휴리스틱 알고리즘
 4. 분지한계 알고리즘
  4.1 분지규칙
  4.2 한계규칙(Bounding Rule)
  4.3 노드제거규칙(Fathoming Rules)
 5. 성능 평가
 6. 결 론
 Acknowledgement
 References
저자
  • 이익선(동아대학교 경영학과) | Ik Sun Lee Corresponding Author