논문 상세보기

콘크리트 댐 드레인홀 회복 사례

Recovery Case of the Drain Hole in Concre

  • 언어KOR
  • URLhttps://db.koreascholar.com/Article/Detail/326101
서비스가 종료되어 열람이 제한될 수 있습니다.
한국구조물진단유지관리공학회 (The Korea Institute For Structural Maintenance and Inspection)
초록

Various methods were investigated to confirm the clogging of the drain hole of the concrete dam and recover it. The effects of drainage holes were investigated through re-drilling at the two locations.

저자
  • 장봉석(K-water 책임연구원, 공학박사) | Jang, Bong Seok 교신저자
  • 오병현(K-water 수석연구원, 공학박사) | Oh, Byung Hyun