For economic evaluation of integrated operation to sewage facilities, benefit-cost analysis was performed to watershed sewage works project in 7 watershed areas, 156 facilities. In this study, the cost before and after integrated operation was compared and benefits are calculated from the reduction of operators, increasement treated pollution loads, reduction cost through operation convenience, reduction water consumption through effluent reuse, and improvement of life benefit. The result showed that cost was 8,500million won and benefit was 16,747million won, so benefit was 49% higher than cost. B/C analysis result showed that B/C ratio was 1.97 and it is similar to other researches. The benefits of integrated operation included convenience of data management, increase of emergency response, decrease of complains with sewage which was not reflected numerically, so the benefits of integrated operation were expected much greater than this result.