The 'Housing Act (‘14.04), which permits the remodeling of old apartment buildings, has been implemented. In particular, vertical remodeling is generally implemented by adding 2~3 floors above the top floor of existing apartments. Technically, it is necessary to reinforce the existing pile due to the increase of vertical, horizontal, seismic load, etc. However, the existing piles are loaded simultaneously and so each pile was constructed at limited base space for application of reinforcement method. The bearing capacity of existing piles decreases due to vertical expansion so the bearing capacity of the piles must be confirmed by the indirect method(laboratory test etc.) in the first safety diagnosis and by the direct method(field test etc.) in the second safety diagnosis.