Cement-milk filled in prebored space has high possibility to leak into surrounding soil when ‘prebored and precast piles’ are constructed according the soil and ground water conditions. The effects of this phenomenon on the lateral resistance are analyzed through the static lateral resistance tests. The 15 mock-up piles are installed to the ground and cement-milk is filled up to the 100% , 75%, and 50% of total lengths of piles from the bottom.