The most wind farm development process in Korea still have not been defined since the history of the wind farm development experiences are very short compared to EU and other developed countries. Therefore, most wind farm development company and researchers have a lot of trouble to implement the wind farm development and need a guideline for the process. Establishing the wind farm needs a complex processes such as transportation system, construction conditions, natural environment and wind conditions etc. Specially, for the restricted development area, the social negotiation and legal minds are necessary. In the case, the decision making process of suitable wind farm area using GIS tool is very useful. However, before using GIS technique, we should understand the development processes and the items for surveying tools. Recently, suitability analysis of selecting Onshore Wind Farm has been studied to consider exclusion analysis to solve the limited develop condition problem. This paper proposed the onshore wind farm development process which can suitable to Korea wind farm environment based on European guideline with GIS tool. To estimate the processes, the processes are divided into two parts, the basic design and wind farm planning. Next, the planning stages are classified into five stages in which the factors for each step were considered.