The concrete vacuum tube structure, which must maintain air-tightness, is manufactured in the form of a segment, and it is necessary to install the joints at uniform gap in order to assemble in the field. In this study, member tests were carried out to investigate the air-tightness performance at the joints of the concrete vacuum tube structures.