The steel pipe manufacturing industry deals with facilities and materials. Especially thermal facilities are close to vapor cloud explosion (VCE) and may cause secondary damage to facilities because they deal with corrosive substances such as hydrofluoric acid, sulfuric acid and acid, fire, explosion, leakage etc. It is in danger. In this study, hazard identification method was conducted using HAZOP techniques and quantitative risk analysis was conducted using e-CA, a program that supports accident impact analysis. Equipment in the influence range of ERPG - 3 was determined to be a facility requiring replacement. It was decided that neutralization is necessary using slaked lime. Based on the cost of loss, We presented the proper replacement which is the timing of the dangerous facility. As a result, It was ideal to replace the facilities with 20 years of heat treatment facilities, one year of hydrofluoric acid storage tank, 20 years of sulfuric acid storage tank, and 5 years of hydrochloric acid storage tank.