In this investigation, the reservoir stability was reviewed using hydrological and physical examination. The results of the review showed that, Both sites were analyzed to lack embankment height and sidewall height in the event of flooding, and it was considered that measures to increase stability should be established in the future by adding more dam cest and increasing side wall of a spill way. In addition, analysis and research will be necessary for other reservoir deteriorated in the future.