PURPOSES : This study analyzes the service life of the repair methods of jointed plain concrete pavement (JPCP) on expressways in Korea using PMS data.
METHODS : The Korea Expressway Corporation PMS data acquired from five major expressways in Korea were used for the analysis. The service lives of the repair methods were considered for two different cases: 1) the previous repair methods had been completely rerepaired by another or the same method due to their damage, and 2) the current repair methods were still in use.
RESULTS : The service lives of D/G and section repair were shown to be at least 30 % and 50 % shorter than expected, respectively. Joint sealing and crack sealing exhibited a service life similar to that expected. The Mill-and-Asphalt-overlay method showed an approximately 30 % longer service life; this might be because some damage to the asphalt overlay is typically neglected until subsequent maintenance and repair. When multiple repairs were applied in series for an identical pavement section, the service life of repairs on previously damaged secti ons become even shorter compared to their first application.
CONCLUSIONS : It was found that the analyzed service life of most important repair methods did not reach the expected service life, and that the service life of the same repair method becomes shorter as applied to the previously repaired concrete pavement sections. These shorter service lives should be seriously considered in future JPCP repair strategy development.