Construction Plan of Demonstration Test Facilities for An Emplacement and Retrieval Device Applicable Deep Borehole Disposal

  • 언어ENG
  • URLhttps://db.koreascholar.com/Article/Detail/430453
모든 회원에게 무료로 제공됩니다.
한국방사성폐기물학회 학술논문요약집 (Abstracts of Proceedings of the Korean Radioactive Wasts Society)
한국방사성폐기물학회 (Korean Radioactive Waste Society)
초록

Deep geological disposal (DGD) of spent nuclear fuels (SNF) at 500 m–1 km depth has been the mainly researched as SNF disposal method, but with the recent drilling technology development, interest in deep borehole disposal (DBD) at 5 km depth is increasing. In DBD, up to 40SNF canisters are disposed of in a borehole with a diameter of about 50 cm, and SNF is disposed of at a depth of 2–5 km underground. DBD has the advantage of minimizing the disposal area and safely isolating highlevel waste from the ecosystem. Recently, due to an increasing necessity of developing an efficient alternative disposal system compared to DGD domestically, technological development for DBD has begun. In this paper, the research status of canister operation technology and plans for DBD demonstration tests, which subjects are being studied in the project of developing a safety-enhancing high-efficiency disposal system, are introduced. The canister operation technology for DBD can be divided into connection device development and operation technology. The developing connection device, emplacing and retrieving canisters in borehole, adopted the concept of a wedge thus making replacement equipment at the surface unnecessary. The new connection device has the advantage of being well applied with emplacement facilities only by simple mechanical operation. The technology of operating a connection device in DBD can be divided into drill pipe, coiled tubing, free-drop, and wireline. The drill pipe is a proven method in the oil industry, but requiring huge surface equipment. The coiled tubing method uses a flexible tube and shares disadvantages as the drill pipe. The free-drop is a convenient method of dropping canister into a borehole, but has a weakness in irretrievability in an accident. Finally, the wireline method can be operational on a small scale using hydraulic cranes, but the number of operated canisters at once is limited. The test facility through which the connection device is to be tested consists of dummy canister, borehole, lifting part, monitoring part, and connecting device. The canister weight is determined according to the emplacement operation unit. The lifting part will be composed following wireline consisting of a crane, a wire and a winding system. The monitoring part will consist of an external monitoring system for hoists and trolleys, and an internal monitoring system for the connection device’s location, pressure, and speed. In this project, a demonstration test will be conducted in a borehole with 1km depth, 10 cm diameter provided by KAERI to verify operation in the actual drilling environment after design improvement of the connecting device. If a problem is found through the demonstration test, the problem will be improved, and an improved connection device will be tested to an extended borehole with a 2 km depth, 40 cm diameter.

저자
  • Seong Bin Kim(Korea Nuclear Engineering & Service Corporation, 65, Myeongdal-ro, Seocho-gu, Seoul) Corresponding author
  • Duk Woon Jung(Korea Nuclear Engineering & Service Corporation, 65, Myeongdal-ro, Seocho-gu, Seoul)
  • Hyun Woo Song(Korea Nuclear Engineering & Service Corporation, 65, Myeongdal-ro, Seocho-gu, Seoul)
  • Moonoh Kim(Korea Nuclear Engineering & Service Corporation, 65, Myeongdal-ro, Seocho-gu, Seoul)