논문 상세보기

Verification of Burnup of Spent Nuclear Fuel Discharged From OPR1000 NPPs

  • 언어ENG
  • URLhttps://db.koreascholar.com/Article/Detail/430740
모든 회원에게 무료로 제공됩니다.
한국방사성폐기물학회 학술논문요약집 (Abstracts of Proceedings of the Korean Radioactive Wasts Society)
한국방사성폐기물학회 (Korean Radioactive Waste Society)
초록

One of the most important factors in the delivery and acceptance requirements for dry storage of spent fuel is the burnup of spent fuel. Here, burnup has a unit of MWD/MTU and is used as a measure of how much nuclear fuel is depleted in a nuclear reactor. In addition, since it is one of the most basic characteristic information for the soundness evaluation of spent nuclear fuel, it is a required item not only by regulatory agencies but also by KORAD, the acquiring agency. The burnup of spent nuclear fuel is the burnup calculated through flux mapping using signals measured from in-reactor instruments during nuclear power plant operation (hereinafter: actual burnup) and the burnup calculated using the core design code (hereinafter: design burnup). In this paper, the design burnup of spent nuclear fuel discharged from OPR100 NPPs (Nuclear Power Plants) in Korea was recalculated to confirm the reliability of the actual burnup currently managed at the nuclear power plant. Basically, since spent nuclear fuel must maintain subcriticality under wet storage or dry storage, a burnup error of about 5% is considered as a conservative approach when evaluating the criticality safety of wet storage tanks and dry storage systems. Therefore, in this paper, we tried to verify whether the difference between actual burnup and design burnup for all spent nuclear fuel released from domestic OPR100 type light water reactor nuclear power plants is within 5%. As a result of the evaluation, the largest deviation between actual burnup and design burnup was about 1,457 MWD/MTU, and when converted into a percentage, it was about 3.3%. Therefore, it was confirmed that the actual burnup managed by OPR1000 NPPs in Korea has sufficient reliability. In the future, we plan to check the reliability of the performance burnup managed in WH NPPs, and some of them will be verified through measurement.

저자
  • Kiyoung Kim(Korea Hydro and Nuclear Power (KHNP) Central Research Institute (KHNP-CRI)) Corresponding author
  • Donghee Lee(Korea Hydro and Nuclear Power (KHNP) Central Research Institute (KHNP-CRI))
  • Kyungho Roh(Korea Hydro and Nuclear Power (KHNP) Central Research Institute (KHNP-CRI))