After melting glass at a high temperature of about 1,100 degrees in the Cold Crucible Induction Melter (CCIM) of the vitrification facility, radioactive waste is fed into the CCIM to vitrify radioactive waste. Accordingly, since the metal sector of the CCIM contacts the high-temperature molten glass, cooling water is supplied to continuously cool the metal sector. The cooling system is divided into primary and secondary cooling water systems. The primary cooling water flows inside the metal sector of the CCIM to maintain the metal sector within normal temperature, thereby forming a glass layer between the metal sector and the high-temperature melting glass. The secondary cooling system is a system that cools the primary cooling water that cools the metal sector, and removes heat generated from the primary cooling system. In addition, it is designed to stably supply cooling water to the secondary cooling water system through an emergency cooling water system so that cooling water can be stably supplied to the secondary cooling water system in the event of secondary cooling water loss. Therefore, it is designed to maintain the facility stably in the event of loss of cooling water for the CCIM of the vitrification facility.