초록

Among the twenty six nuclear power plants in Korea, twenty four plants are currently in operation excluding the two permanently shut-down Kori #1 and Wolsung #1 plants. The decommissioning process includes many tasks such as cutting, decontamination, disposal and treatment. Among the tasks, because cutting is one of the tasks performed close to the target structure, there is a possibility for the workers to be exposed excessively to the radiation. There are representative large structures such as steam generators, nuclear reactors, reactor coolant pump, and pressurizer, made of metals, and radioactive concrete, made of concrete. Especially, compared to the trend of research to manage the radiation exposure of steam generators that are directly connected to pressurizers, the trend of research to manage the radiation exposure of pressurizers to workers is not satisfactory. Moreover, although there have been many studies on radioactive concrete, the studies to manage the radiation exposure to workers with a systematic cutting scenario are insufficient. In this study, radioactive concrete, a representative large structure made of concrete, was selected as the target for evaluation. The conditions for evaluation were cutting speed (1~10 m2/hr) and the time for cutting (permanent shutdown~30 years after the shutdown). A cutting scenario was developed by applying the situation for abrasive decontamination beforehand and Hot-to-Cold and Cold-to-Hot, and effort was made to derive a reasonable plan. The evaluation result derived were hourly radiation dose distribution of 1.19~0.103 mSv/hour and 1.29~0.0113 mSv/hour for a scenario without abrasive decontamination (in the order of Hot to Cold, Cold to Hot), and hourly radiation dose distribution of 0.547~0.0479 mSv/hour and 0.608~0.0522 mSv/hour for a scenario with abrasive decontamination. The maximum value of collective dose derived was 1.54E+04 mSv at the cutting time of permanent shutdown with cutting speed of 1 m2/hour in the Cold to Hot scenario before abrasive decontamination, and the minimum value derived was 5.15E+01 mSv at the cutting time of 30-year after the permanent shutdown with cutting speed of 10 m2/hour in the Hot to Cold scenario after abrasive decontamination.

저자
  • Hak Yun Lee(Chosun University)
  • Jong-Soon Song(Chosun University) Corresponding author