논문 상세보기

International Technical Cooperation on Decommissioning of Heavy Water Reactor

  • 언어ENG
  • URLhttps://db.koreascholar.com/Article/Detail/431081
모든 회원에게 무료로 제공됩니다.
한국방사성폐기물학회 학술논문요약집 (Abstracts of Proceedings of the Korean Radioactive Wasts Society)
한국방사성폐기물학회 (Korean Radioactive Waste Society)
초록

According to IAEA PRIS, there is no record of dismantling commercial heavy water reactors among 57 heavy water reactors around the world. In Canada, which has the largest number of heavy water reactors, three of the 22 commercial heavy water reactors with more than 500 MW are permanently suspended, Gentilly unit 2 (2012), Pickering unit 2 (2007), and Pickering unit 3 (2008), all of which chose a delayed decommissioning strategy. On the other hand, Wolsong unit 1, which will be the world’s first heavy water reactor to be dismantled commercially, will be immediately carried out as a decommissioning strategy. KHNP has established various cooperation systems with advanced companies and international organizations related to overseas NPP decommission and is actively exchanging technologies. Among them, the most important focus is on research cooperation related to COG (CANDU owners Group). The first case is a joint study on Conceptual Calandria Segmentation. Four areas of process, waste management, ALARA, and cost for decommissioning reactors to be submitted to Canadian regulators for approval of Pickering and Gentilly-2’s preliminary decommissioning plan have been evaluated, and research on Wolsong unit 1 is currently underway. The second case is Decommissioning and long-term waste management R&D. Although the technical maturity is low, it studies the common interests of member companies in the decommissioning of heavy water reactor power generation companies and long-term waste management. Robotics for dismantling high-radiation structures, C- 14, H-3 measurement and removal methods, and concrete decontamination technology, which are characterized by heavy water, are being actively studied. KHNP is strengthening international cooperation with COG to prepare for the successful decommissioning of Wolsong unit 1. Based on previous studies by Pickering and Gentilly-2, an evaluation of the decommissioning of Wolsong unit 1 reactor is being conducted. In addition, it is preparing for decommissioning through experience analysis of the pressure tube replacement project.

저자
  • Min Chul Kim(Korea Hydro and Nuclear Power (KHNP) Central Research Institute (KHNP-CRI)) Corresponding author
  • Gang Woo Ryu(Korea Hydro and Nuclear Power (KHNP) Central Research Institute (KHNP-CRI))
  • Young Il Na(Korea Hydro and Nuclear Power (KHNP) Central Research Institute (KHNP-CRI))
  • Suk Won Jung(Korea Hydro and Nuclear Power (KHNP) Central Research Institute (KHNP-CRI))
  • Hyun Min Kim(Korea Hydro and Nuclear Power (KHNP) Central Research Institute (KHNP-CRI))
  • Hyun Jun Jo(Korea Hydro and Nuclear Power (KHNP) Central Research Institute (KHNP-CRI))