Analysis of Natural Rocks Collected From Uranium Deposits in Okcheon Metamorphic Zone Using Raman Spectroscopy

Euo Chang Jung, Hee-Kyung Kim, YeoJin Ju, Dawoon Jeong, Min-Hoon Baik, Ji-Hun Ryu, Jang-Soon Kwon
  • 언어ENG
  • URLhttps://db.koreascholar.com/Article/Detail/431156
서비스가 종료되어 열람이 제한될 수 있습니다.
한국방사성폐기물학회 학술논문요약집 (Abstracts of Proceedings of the Korean Radioactive Wasts Society)
한국방사성폐기물학회 (Korean Radioactive Waste Society)
초록

Raman characteristics of various minerals constituting natural rocks collected from uranium deposits in Okcheon metamorphic zone in Korea are presented. Micro-Raman spectra were measured using a confocal Raman microscope (Renishaw in Via Basis). The focal length of the spectrometer was 250 mm, and a 1800 lines/mm grating was installed. The outlet of the spectrometer was equipped with a CCD (1,024256 pixel) operating at -70°C. Three objective lenses were installed, and each magnification was 10, 50, and 100 times. The diameter of the laser beam passing through the objective lens and incident on the sample surface was approximately 2 m. The laser beam power at 532 nm was 1.6 mW on the sample surface. Raman signal scattered backward from the sample surface was transmitted to the spectrometer through the same objective lens. To accurately determine the Raman peak position of the sample, a Raman peak at 520.5 cm-1 measured on a silicon wafer was used as a reference position. Since quartz, calcite, and muscovite minerals are widely distributed throughout the rock, it is easy to observe with an optical microscope, so there is no difficulty in measuring the Raman spectrum. However, it is difficult to identify the uraninite scattered in micrometer sizes only with a Raman microscope. In this case, the location of uraninite was first confirmed using SEM-EDS, and then the sample was transferred to the Raman microscope to measure the Raman spectrum. In particular, a qualitative analysis of the oxidation and lattice conditions of natural uraninite was attempted by comparing the Raman properties of a micrometer-sized natural uraninite and a laboratory-synthesized UO2 pellet. Significantly different T2g/2LO Raman intensity ratio was observed in the two samples, which indicates that there are defects in the lattice structure of natural uraninite. In addition, no uranyl mineral phases were observed due to the deterioration of natural uraninite. This result suggests that the uranium deposit is maintained in a reduced state. Rutile is also scattered in micrometer-sizes, similar to uraninite. The Raman spectrum of rutile is similar in shape to that of uraninite, making them confused. The Raman spectral differences between these two minerals were compared in detail.

키워드
Raman spectroscopySEM-EDSNatural uraniniteUO2Uranium deposits
저자
  • Euo Chang Jung(Korea Atomic Energy Research Institute (KAERI)) Corresponding author
  • Hee-Kyung Kim(Korea Atomic Energy Research Institute (KAERI))
  • YeoJin Ju(Korea Atomic Energy Research Institute (KAERI))
  • Dawoon Jeong(Korea Atomic Energy Research Institute (KAERI))
  • Min-Hoon Baik(Korea Atomic Energy Research Institute (KAERI))
  • Ji-Hun Ryu(Korea Atomic Energy Research Institute (KAERI))
  • Jang-Soon Kwon(Korea Atomic Energy Research Institute (KAERI))