Kori unit 1 and Wolsong unit 1 were permanently shut down in 2017 and 2019, respectively. Both plants were decided to demolish the building without reuse. Large structures must be demolished after removing systems and components in the building, and in the case of large structures, thorough planning is required because of the large scale of work. Therefore, in this study, important considerations in the phase of the demolition plan of large structures when decommissioning were analyzed. The demolition of large structures at nuclear facilities is major one phase of work within a broader decommissioning plan. Furthermore, the actual demolition of the structure (i.e., physical process) represents the last step in a process that begins with extensive planning and analysis. The National Demolition Association (NDA) has provided checklist items that should be considered before the start of a commercial demolition project and/or in the bid process. Important Considerations in the Phase of the demolition plan of large structures when decommissioning of nuclear facilities are Site knowledge and programs, Engineering survey/demolition plan, Hazardous and radioactive materials, Open air demolition, Financial and project management, Permits, Code adherence, and Special programs, Disposal pathway, Final site condition. The results of this study can be used as a basis for the Planning large structures demolition of the Kori unit 1 and Wolsong unit 1.