Optimal Cutting Method of Pipe Connected to Kori Unit 1 Steam Generator

  • 언어ENG
  • URLhttps://db.koreascholar.com/Article/Detail/431449
모든 회원에게 무료로 제공됩니다.
한국방사성폐기물학회 학술논문요약집 (Abstracts of Proceedings of the Korean Radioactive Wasts Society)
한국방사성폐기물학회 (Korean Radioactive Waste Society)
초록

Kori Unit 1, pressurized water reactor, is the Korea’s first commercial nuclear power plant. It successfully generated electricity for a period of 30 years, commencing from April 19, 1978. Following its approval for continued operation in 2008, Kori Unit 1 continued to operate for an additional 9 years, resulting in a total operational period of 39 years. On June 18, 2017, Kori Unit 1 was permanently shut down. Since then, Korea is actively preparing for the decommissioning of nuclear power plant. During the decommissioning of a nuclear power plant, the heavy components such as reactor, steam generator, pressurizer, reactor coolant pump located in the containment building should be taken out of the containment building. To take out heavy components from the containment building, pipes connected to heavy component should be cut. There are numerous pipes connected to the heavy component, each with varying dimensions and material. Each pipe has a different level of contamination depending on its use. In this study, optimal cutting method of pipe connected to steam generator, one of the heavy components of nuclear power plant, is proposed during the decommissioning of Kori unit 1. In case of pipe connected to Kori unit 1 steam generator, material is stainless steel or carbon steel. These pipes have varying inner diameter, ranging from 0.6 cm to 74 cm, and thickness ranging from 0.15 cm to 7.1 cm. These pipes are classified as low and intermediate level waste (LILW) or very low level waste (VLLW). Because characteristics of pipes are different, each pipe optimal cutting methods are proposed differently considering material, dimension, contamination level, cutting cost, cutting time, and the management of secondary waste. As a result, the cutting method for pipe of reactor coolant system is selected to orbital cutting. The cutting method of main steam pipe and main feedwater pipe is selected to oxygen cutting. In case of other small pipes, cutting method is selected to circular saw.

저자
  • Hyeon-Ki Kim(Kepco International Nuclear Graduate School (KINGS)) Corresponding author
  • Chang-Lak Kim(Kepco International Nuclear Graduate School (KINGS))