검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 2

        1.
        2013.10 서비스 종료(열람 제한)
        Post-installed anchor is installed in non-cracked concrete after corrosion to investigate pullout strength of the anchor. Pullout test was conducted diameter, insertion depth of the anchor of a couple of variables. If it receive pullout load, performance of corroded anchor is degraded by the reduction of the cross-section of the anchor body.
        2.
        2013.09 KCI 등재 서비스 종료(열람 제한)
        In this study, performance of the post-installed anchor system was evaluated with reduced strength of concrete and anchor. One of the post-installed anchors was selected to performance evaluation. Concrete strength was reduced by freeze-thawing test, and the post-installed anchor strength was reduced by corrosion test. The post-installed Anchor was installed in concrete of freezing and thawing and original concrete, and corroded anchor was installed in original concrete only. Anchor diameter and installation depth of the anchor were the variable for each specimen. Performance of post-installed anchor system of each specimen was evaluated by pullout test. Anchor diameter and installation depth of anchor, it may affect the performance of the post-installed anchor system from the experimental test results. Fracture mode of each post-installed anchor system had occurred differently depending on the durability of concrete and anchor. The anchor pullout strength from the experimental test results was used in order to compare with the results of CCD (Concrete Capacity Design) method, and CCD equation was modified. Modified equation was able to predict the anchor pullout strength of post-installed anchor system in Original concrete and freezing and thawing of concrete.