검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 3

        1.
        2022.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Many manufacturers applying third party logistics (3PLs) have some challenges to increase their logistics efficiency. This study introduces an effort to estimate the weight of the delivery trucks provided by 3PL providers, which allows the manufacturer to package and load products in trailers in advance to reduce delivery time. The accuracy of the weigh estimation is more important due to the total weight regulation. This study uses not only the data from the company but also many general prediction variables such as weather, oil prices and population of destinations. In addition, operational statistics variables are developed to indicate the availabilities of the trucks in a specific weight category for each 3PL provider. The prediction model using XGBoost regressor and permutation feature importance method provides highly acceptable performance with MAPE of 2.785% and shows the effectiveness of the developed operational statistics variables.
        4,000원
        3.
        2020.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Many small and medium-sized manufacturing companies process various product types to respond different customer orders in a single production line. To improve their productivity, they often apply batch processing while considering various product types, constraints on batch sizes and setups, and due date of each order. This study introduces a batch scheduling heuristic for a production line with multiple product types and different due dates of each order. As the process times vary due to the different batch sizes and product types, a recursive equation is developed based on a flow line model to obtain the upper bound on the completion times with less computational complexity than full computation. The batch scheduling algorithm combines and schedules the orders with same product types into a batch to improve productivity, but within the constraints to match the due dates of the orders. The algorithm incorporates simple and intuitive principles for the purpose of being applied to small and medium companies. To test the algorithm, two case studies are introduced; a high pressure coolant (HPC) manufacturing line and a press process at a plate-type heat exchanger manufacturer. From the case studies, the developed algorithm provides significant improvements in setup frequency and thus convenience of workers and productivity, without violating due dates of each order.
        4,000원