검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 2

        1.
        2014.10 서비스 종료(열람 제한)
        In the remodeling underpinning, Connection between pile and footing is very important considering load transfer aspect. In this paper, the 3type construction cases of connection is introduced.
        2.
        2013.04 서비스 종료(열람 제한)
        For pile construction of underground extension in the remodeling, existing piling method have limitations. These method can't access the restricted area and construction period must be delayed by many piling steps. To overcome these defects of existing method, SAP method is developed and gained the NET(No.684). Also, SAP method applied in remodeling site of Chung-Dam Dong 00 APT.