검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 44

        41.
        2004.12 KCI 등재 서비스 종료(열람 제한)
        In this study the results of optimal water supply analysis by operating constraints of reservoirs during drought period are as follows. During drought period, water supply reliability is possible about 97~61% by CASE 1~CASE 5. Water supply reliability is possible about 97.3% in case of the Andong dam and 87.7% in case of the Imha dam by CASE 3. Also, under the constraints of CASE 4, water supply reliability is possible about 87.5% in case of the Andong dam and 73.3% in case of the Imha dam. The reason what low of available water supply ratio is decreased inflow of Imha dam. When compare standard deviation of average storage with standard deviation of storage, stable storage can be secured during successive drought period. And it also can minimize shortage of water during drought. therefore, it is impossible that reservoir supply sufficient water but change of operating condition is better than pervious on that followed by full reservoir level. It is need that the study for optimal water supply during drought period has to be continued.
        43.
        2004.09 KCI 등재 서비스 종료(열람 제한)
        HEC-RAS model is used for estimation of rating-curve of Musung in Wi stream. Discharge is computed from stage estimated by HEC-RAS model, is compared with the discharge of water surface slope method. The relative deviation of observed and computed discharge is 5.37%, and shows as a good results. A rating-curve by HEC- RAS model shows better results than by water surface slope method.
        44.
        2004.03 KCI 등재 서비스 종료(열람 제한)
        In this study analyzed the reliability indices against the water supply ability of Andong dam. The water supply analysis of Andong dam used the HEC-5 model. So Andong dam simulated planed water-supply capacity of Andong dam as increase and decrease +5%~-5% of water supply quantity. Water-supply capacity of Andong dam estimated, deficit occurrence, deficit quantity, deficit period. As the results estimated reliability(occurrence based, time based, quantity based) and resiliency vulnerability and with water supply capacity evaluation indices of Andong dam. Also reliability(occurrence based, time based, quantity based), resiliency, vulnerability and resiliency indices are estimated to evaluated the performance of water supply on Andong dam, and their relationships are evaluated.
        1 2 3